Your browser is out of date.

You are currently using Internet Explorer 7/8/9, which is not supported by our site. For the best experience, please use one of the latest browsers.

banner
Projects

Projects

Greens Bayou Pipe Mill has produced pipe for most of the major oil and gas companies and nearly all the various fabricators in the offshore market. We have also fabricated pipe for many civil contractors. Greens Bayou has built a reputation for fast, on-time delivery of a wide variety of fabricated tubular steel and specialty pipe.

Woodrow Wilson Bridge

Woodrow Wilson Bridge

Over the Potomac River for the Washington Beltway. Fabricated 29,800 tons of 54 inch, 66 inch and 72 inch pipes in lengths of 200 feet.
Exxon – Diana/Hoover

Exxon – Diana/Hoover

Fabricated all rolled tubulars for the 26,500 ton project.
PEMEX EPC-1

PEMEX EPC-1

Fabricated all rolled tubulars, including jackets, topsides and piling, for the 50,000 ton project.
Offshore Jacket Legs at Greens Bayou Pipe Mill Loading Dock

EOG Resources – Oilbird Project

Fabricated 1,950 tons of jacket legs, high grade bracing, deck legs and piling.
Weeks Marine LNG Terminals

Weeks Marine LNG Terminals

Dominion Cove Point LNG Terminal, Golden Pass LNG Terminal, Cameron LNG Terminal and Sabine Pass LNG Terminal totaling nearly 10,000 tons of large diameter tubulars.
NYDOT Tappen Zee Bridge

NYDOT Tappen Zee Bridge

Fabricated 48″, 96″, and 120″ test piles
Ready to get started?